Construction of Overflow Pipe Line and Development of Old Lagoon in Al Dakhira Treatment Plant AA/09-10/M/189/S
رقم المناقصة
PWA/STC/044/09-10
النوع
STC
المشاركون
القطريين فقط ,
الحالة
أرشيفية
سندات المناقصة
19,000 ر.ق.
تاريخ الاصدار
09 ديسمبر 2009
تاريخ الإغلاق
04 يناير 2010
رسوم مستندات المناقصة
500 ر.ق.
تفاصيل المناقصة
The Works comprise and but not be limited to the followings Development of old Lagoon (Cleaning inside Lagoon and remove the grass) gather near the site (not exceeding 1 km.) To raise the bund  height at least 1m and make good compaction on the top and sides of Lagoon. Laying the PVC pipe diameter is 200mm, connection, testing and put concrete surround 200mm from screening material (Backfill material)  Excavate trench for PVC pipe 200mm diameter, connection, testing, 200mm bedding and 300mm surround selected material after screening. Construction of inspection chamber 600×700x700mm, with concrete cover slab. Construction of open input  water chamber onto lagoon’s bund level. 300mm concrete Surround the pipe on the base, top and side of output to protect pipe In addition, the works shall include all removal, disposal and backfilling of excavated material on/off site and removal and disposal of wreckage, surplus materials or rubbish or debris off site where applicable. The Contractor shall construct, test, commission and maintain the whole of the Works in this Contract.
رسوم مستندات المناقصة
500 ر.ق.
تفاصيل الاتصال
إدارة الخدمات الهندسية
هيئة الأشغال العامة
فاكس: 0097444950777
بريد إلكتروني: esd.tenders@ashghal.gov.qa